January 1, 2026
Panama City, FL

Site Office Facility Improvements, Panama City, FL

This project required Arrowhead Contracting to make repair and upgrades to USACE site office located in Panama City, FL. The project required the installation of Exterior Fencing in […]
December 5, 2025
Bldg. 8 Roof Repairs, NAS Corpus Christi, TX

Bldg. 8 Roof Repairs, NAS Corpus Christi, TX

This project required Arrowhead to replace roof section “S” at building 8 located at NAS Corpus Christi, TX.  Arrowhead demolition the roof all the way to the deck and made […]
October 5, 2025
Vegetation Erosion Control Phase 1 NAS-JRB New Orleans, LA

Vegetation Erosion Control Phase 1 NAS-JRB New Orleans, LA

This project required Arrowhead Construction to design and construct the removal of Vegetation Erosion Control Phase 1 (Olson Drive – Primary Traffic Corridor). This requirement was needed to […]
September 1, 2024
Demo, NAS Meridian, MS

Demolition of Building 205 and Building 206, NAS Meridian, MS

This project required Arrowhead to demolition B205 and 206, located at NAS Meridian, MS.  Both dorm facilities were approximately 25,000 square feet each and required completed […]
July 5, 2024
Big-Beaver Dam, Fort Gordon, GA

Repair Big Beaver Dam, Fort Gordan, GA

Project required Arrowhead to design and replace Big Beaver Dam outlet control structure. Arrowhead furnished all design, labor, material, equipment, incidentals, supervision, and transportation for work necessary to replace the […]
November 10, 2021
Anniston Army Depot

Arrowhead Awarded $4M SATOC!  

The USACE Mobile District Office awarded Arrowhead a $4M 8(a) Sole Source SATOC / IDIQ Construction and MILCON Support, with Design Capabilities for Anniston Army Depot, Alabama. Services include but not limited to renovation, repair, and new construction requirements.
June 21, 2021
Fort Rucker

Design-Build at Ft. Rucker  

The USACE Mobile District Office awarded Arrowhead a $4M 8(a) Sole Source SATOC / IDIQ Construction and MILCON Support, with Design Capabilities for Anniston Army Depot, Alabama. Services include but not limited to renovation, repair, and new construction requirements.
August 1, 2020

Opal Beach Painting and Hardware Replacement

e 21, 2021, the USACE Mobile District awarded Arrowhead a partial Design-Build Construction project under contract number The National Park Service Gulf Islands National Seashore awarded Arrowhead...
July 12, 2020
Fort Pickens Ranger Station Marina

Repair Fort Pickens Ranger Station Marina

On June 21, 2021, the USACE Mobile District awarded Arrowhead a partial Design-Build Construction project under contract number The National Park Service Gulf Islands National Seashore awarded Arrowhead...