Site icon Arrowhead Contracting, Inc.

Vegetation Erosion Control Phase 1 NAS-JRB New Orleans, LA

Vegetation Erosion Control Phase 1 NAS-JRB New Orleans, LA

Vegetation Erosion Control Phase 1 NAS-JRB New Orleans, LA

This project required Arrowhead Construction to design and construct the removal of Vegetation Erosion Control Phase 1 (Olson Drive – Primary Traffic Corridor). This requirement was needed to prevent the continuation of down vegetation impacting the primary Weapons Haul Route and Olsen Drive Traffic Corridor; including removal of the vegetation posing a life safety risk to those utilizing the Back Gate Walking Path / Sidewalk.

Exit mobile version